Semnan Road Projrcts

  • Semnan– Damqan 4th Parcel

    Discription

    • Client:
      Ministry of Road &Urban Development
    • Contract Value:
    • Contract Duration:
    • Project Manager:
      Ms.Akram Arabnejad
  • Damqan- Shahrood highway

    Discription

    • Client:
      Ministry of Road &Urban Development
    • Contract Value:
      20.000.000.000ریال
    • Contract Duration:
      12 Mo
    • Project Manager:
  • Shahrood Beltway 2nd Track

    This Parcel is an important section of Tehran- Mashad Freeway which will increase capacity and safety. This ring road passes through northern part of Damagan outskirts diverting transit traffic away from local which has improved traffic. Also construction of Damqan- Amirabad& Damqan- Shahrood highways along with Shahrood Ring road had a major role in bringing area’s accident numbers down.

    • Client:
      Ministry of Road &Urban Development
      Road development Office
    • Contract Start:
      1381
    • Physical Progress:
      100%
    • Project Manager:
      Mr.Mehr Hosin Khalighi
    • Project construction Manager:
      Mr.Ali Mirzaee
    • Sub- Projects:
      Shahrood ring road west junction
      Teharn- Mashad Railway Bridge and Shahrood ring road
      multi-level junctions at Badasht
      Saadabad
      Galoogah and Cheshme Ali Bridge
  • Shahrood- Miandasht rehabilitation type J

    With respect to deteriorating conditions of major part of this highway along with sub- standard vertical and linear curves and inadequate pavement, the renovation operation was done. Required technical structures and bridges over river were also designed and constructed.

    • Client:
      Ministry of Road &Urban Development
    • Contract Start:
      1385
    • Physical Progress:
      90% ,ongoing.
    • Project Manager:
      Mr.Reza Ghavidel
    • Project construction Manager:
      Mr.Shahsavarani
    • Sub- Projects:
      90 KM highway renovation &related technical structures
      construction of 60 Km highway rehabilitation andpavement
  • Damqan- Moaleman Highway

    The 107 Km Damqan- Moaaleman highway constructed as a part of north- south corridor the new corridor will attract Kerman &Hormozgan traffic and will direct them through Ardakan- Jandaq, Moaleman- Damqan & Damqan, Dibaj, Galugah highways to Goragan, Sari and ultimately Amireabad & Turkaman ports. Construction of the 2nd track of this highway is an important section of north- south corridor which is under study by ImenRah.

    • Client:
      Ministry of Road
      Urban Development
    • Contract Start:
      1387
    • Physical Progress:
      70%
    • Project Manager:
      Mr.Tayeb Alipoor
    • Project construction Manager:
  • Garmsar- Semnan existing highway rehabilitating

    Garmsar- Semnan highway rehabilitation was considered to improve geometric plan, pavement, shoulders and safety of existing old and new tracks. The rehabilitation was done over 100 Km in both in &out bounds.

    • Client:
      Ministry of Road &Urban Development, road maintenance
    • Contract Start:
      1389
    • Physical Progress:
      100 %
    • Project Manager:
      Mr.Nima Amid
    • Project construction Manager:
      Mr.Shahsavarani
  • Semnan- Shahmirzad Highway

    This highway will direct Semnan Province traffic to northern provinces. It starts at Semnan city and goes to Azadshahr highway. Shahmirzad area as a tourist’s choice in Semnan province has heavy traffic throughout the year. This highway which use to have one in &one out bound is working as a 4 lane highway now.

    • Client:
      Ministry of Road &Urban Development
    • Contract Start:
      1387/12/5
    • Contract Duration:
      23Mo
    • Physical Progress:
      60%
    • Project Manager:
      Mr.Abolfazl Azhir, Mr Mohammad Reza Ghazimoradi
  • Semnan- Nayshapoor feasibility (economic- technical) preliminary studies

    This freeway is assisting Tehran- Mashad ,with very heavy traffic, as a major east- west transit corridor. This ancient highway which was known as the “silk Road” has high cargo transit potentials between north-eastern provinces.

    • Client:
      Ministry of Road &Urban Development
    • Project Manager:
      Ms.Akram Arabnejad
    • Project construction Manager:
  • 9 مشخصات پروژه

    Discription

    • Client:
      Ministry of Road &Urban Development
    • Contract Value:
      20.000.000.000ریال
    • Contract Duration:
      12 Mo
    • Project Manager:
    • Project construction Manager:
      مهندس کورس عراقی
  • 10 مشخصات پروژه

    Discription

    • Client:
      Ministry of Road &Urban Development
    • Contract Value:
      20.000.000.000ریال
    • Contract Duration:
      12 Mo
    • Project Manager:
    • Project construction Manager:
      مهندس کورس عراقی